Peoplemax’s Auckland Transport Ambassadors complete marathon 6 week Rugby World Cup project

The Countdown is over, the 2011 Rugby World Cup ended on 23rd October 2011 with the All Blacks taking home the World Champion Title.

During the 6 week Rugby World Cup Period PeopleMax® contractors oversaw the communications for public transport users, each handling anywhere between 50 interactions with people at quieter stations such as Takapuna, right up to 700 interactions at Kingsland Train Station.

PeopleMax Ambassadors

Throughout the tournament as the crowds and excitement builtPeopleMax® was able to respond to the large demand for part-time staff at short notice. Anyone who needed help with transport issues or alternative public transport, our project staff were able to assist.

 Peoplemax’s Auckland Transport Ambassadors
To also cater for the games and the fan zones in downtown Auckland, there were a lot of road closures that forced changes to the bus timetables. Our event staff were mainly stationed around the Britomart main transport hub to inform the public of these bus stop changes, either redirecting them with maps of walking them to the exact stop.

Peoplemax’s Auckland Transport Ambassadors

Over all we received a lot of great feedback from the public about the help they received from our PeopleMax® Ambassadors and overall think the RWC event was a great success for PeopleMax®.

  • Sandringham Bus Services

    Central city road works in Bowen Street were behind the temporary relocation of several bus-stops in January, which affected buses travelling to the Sandringham area. Once the work was completed, PeopleMax® had members of their contract workforce out making people aware that they could return to their usual bus stops

  • Otara Transport Centre

    More transport upgrades have been underway around the city – this time in South Auckland – at the Otara Transport Centre on January 16th and 17th. The upgrade meant that the usual stops were closed and buses were relocated to temporary stops. PeopleMax® had part-time contract workers on hand as

  • Britomart Project

    Hi there, I just thought I would drop you a line, to say how impressed I was with the staff on site at Britomart. Especially the security guards and also the people in white. My husband and family caught the train on Saturday and because I had a pram and

Like Us